Utilities and Energy
These are few examples of the type of work Kore Systems has provided to some of our clients:
Data Acquisition Systems
Kore Systems designed, developed, and configured a data acquisition system to collect data from a utility’s existing SCADA system. Kore provided advanced database development services to optimize the customers existing SQL Server table structure.
Upon successful completion of the first DAS project Kore was invited to participate in design and development of a second data acquisition system to collect over 2000 data points. Kore designed a system to collect the utility data locally then transmit the data across a secure wide area network to the customers local SQL Server. The data is published in near real-time on a graphical interface. Kore worked closely with the customer to develop a custom graphical interface package based on their design to meet unique data processing and presentation requirements.
Since our first project with this customer Kore continues to receive contract awards based on our performance.
Sediment Remediation Plant Control System
Kore Systems designed, developed, and configured a data acquisition system to collect data from a utility’s existing SCADA system. Kore provided advanced database development services to optimize the customers existing SQL Server table structure.
Upon successful completion of the first DAS project Kore was invited to participate in design and development of a second data acquisition system to collect over 2000 data points. Kore designed a system to collect the utility data locally then transmit the data across a secure wide area network to the customers local SQL Server. The data is published in near real-time on a graphical interface. Kore worked closely with the customer to develop a custom graphical interface package based on their design to meet unique data processing and presentation requirements.
Since our first project with this customer Kore continues to receive contract awards based on our performance.
Treatment System Design and Integration
Kore Systems provided Electrical Engineering, Control Systems Engineering, Instrumentation Specifications and SCADA/PLC programming/Integration for our client’s Class 1 Hazardous Waste Landfill Leachate treatment plant. In addition Kore Systems was directly responsible for Construction Management, Compliance Management (NEC verifications) and Quality control during the construction phase. Kore provided dedicated engineering support during system testing, and startup support.
Landfill Thermal Treatment Unit SCADA Integration
Kore Systems provided design and integration of the SCADA network and interface package at the Landfill thermal Treatment Unit at our client’s facility located in Marina California. Kore Systems is currently the Control Systems contractor for the Ground Water Treatment Systems at the site. Kore Systems personnel have been providing support to the prime contractor for the past ten years and have unique a knowledge of systems operations and capabilities regarding hardware and software currently in use at the site. The SCADA system, designed by Kore Systems personnel, operates on a microwave Network that consists of numerous radio sites and an unlimited tag graphical user interface package. Recently the client added a Thermal Treatment Unit at a nearby location to safely burn off landfill gases. The objective of the Landfill Thermal Treatment Unit SCADA project was to provide remote monitoring and alarming for the Thermal Treatment Unit. The integration of the Thermal Treatment Unit into the SCADA system reduced risk of unknown events during extended hours as well as provided monitoring and remote access for the Landfill Flare site personnel.